Skip to content
EN
Site assessment
SingleUnit Air: miner, HashLink Automation Controller and touchscreen monitor showing the HASHLYNK interface

SingleUnit

For residential buildings, small businesses & agriculture

SingleUnit uses PV surplus on site with one or two miners, making it the simplest way to start using surplus electricity.

SingleUnit at a glance

SingleUnit gets more out of the surplus electricity from your PV system: instead of being exported for a few cents or curtailed, it works for you right on site. Depending on your needs, one or two Bitcoin miners turn the surplus electricity into computing power, remunerated in Bitcoin directly to your own wallet.

The system runs fully automatically and continuously adjusts its power to the surplus. You can check its operating status and output at any time. The Air version is designed purely for using electricity; the Hydro version also makes the resulting heat available for buffer tanks, heating or a pool.

How surplus electricity becomes additional revenue

Electricity, computing power, Bitcoin, euro: this is how HASHLYNK creates economic value from surplus electricity. Whether you keep the Bitcoin in your wallet or exchange it for euros is up to you. Electricity is not simply “consumed” but converted into a digital, saleable stream of value.

  1. Electricity
  2. computing power
  3. Bitcoin
  4. euro
Heat

Product features

SingleUnit features

SingleUnit is designed for a quick, manageable start and uses the existing electrical and building services. Both versions share the same basis; they differ in cooling and heat use.

SingleUnit Air: miner, HashLink Automation Controller and touchscreen monitor showing the HASHLYNK interface
  • 1 to 2 miners

    Depending on your needs, SingleUnit works with one or two miners. This keeps investment and effort low.

  • Fully automatic operation

    The HashLink Automation Controller detects the available surplus, for example via the inverter, and controls the miners independently.

  • Remote monitoring

    Operating status and output can be viewed at any time. Monitoring and remote maintenance continue permanently after commissioning.

  • Brand-name components

    Control cabinet and sub-distribution board by Rittal, control and protection components by Siemens, sensors by Keyence and IFM, network technology with firewall.

Air or Hydro: the two versions

SingleUnit AirSingleUnit Hydro
Cooling

Air

Water, closed cooling circuit

Heat use

None, exhaust air up to 70 °C

Via heat exchanger, up to 60 °C flow temperature

Operating noise

Up to 60 dB at the miner

Miner almost silent, dry cooler approx. 48 dB

Recooling

Not required, integrated in the miner

Dry cooler when no heat is needed

Monitoring

Via HashLink Automation Controller

Additional flow and pressure sensors in the cooling circuit

Control

HashLink Automation Controller, optionally with its own control cabinet

HashLink Automation Controller and control cabinet with PLC

Installation

Plug & play by shipping, installation by HASHLYNK optional

Electrical work by HASHLYNK, hydraulics by an installation partner

Commissioning

2 hours of remote commissioning included

By HASHLYNK and the installation partner

Scope of delivery

Miner, HashLink Automation Controller, remote commissioning

Optional: control cabinet with sub-distribution board

Miner, control cabinet, HashLink Automation Controller, heat exchanger, dry cooler, pumps, sensors, piping, planning and commissioning.

Hydraulic connection separately via an installation partner.

SingleUnit Air on a plant-room shelf with touchscreen monitor and HashLink Automation Controller, next to the distribution board and storage tank

The benefits of SingleUnit

Manageable investment

One or two miners, one controller, a clear scope of delivery. You start with a manageable budget and see in your own operation what your surplus is worth.

More than the feed-in tariff

Exported electricity often earns only 2 to 4 cents per kWh. With SingleUnit, the same kilowatt hour brings 5 to 20 cents, depending on the market.

Heat as a second benefit

With the Hydro version, waste heat becomes usable heat, for example for a pool, buffer tank or heating. This saves energy that would otherwise have to be added.

How SingleUnit comes to your site

Four steps to operation: for Air mostly remotely, for Hydro together with an installation partner on site.

SingleUnit Air

  1. Site assessment

    The site assessment shows us which system fits best. In a personal conversation, we then discuss implementation, yield and investment.

  2. Delivery and set-up

    SingleUnit is shipped to you and set up quickly. HASHLYNK can optionally take over the installation for an extra charge.

  3. Remote commissioning

    In two hours, we set up the system remotely and show you everything important. This remote commissioning is already included in the price.

  4. Automatic operation

    From now on, SingleUnit runs fully automatically, and you can keep an eye on output and operating status at any time.

SingleUnit Hydro

  1. Site assessment

    The site assessment shows us which system fits best. In a personal conversation, we then discuss implementation, yield and investment.

  2. Coordination & installation

    Together, we clarify the right location, how the heat will be used and what happens when no heat is needed. HASHLYNK then takes care of the control cabinet and electrical work, an installation partner connects it to your heating system.

  3. Commissioning

    HASHLYNK and the installation partner commission the system together on site.

  4. Handover and operation

    From now on, SingleUnit Hydro runs fully automatically, and you can keep an eye on output, operating status and heat output at any time.

What your site needs

  • A protected power connection for around 4 kW continuous load per miner, with its own sub-distribution board from two miners

  • A connection to your PV system, for example via the inverter

  • A network connection (LAN) at the installation location

  • Air: a location where noise of up to 60 dB and warm exhaust air of up to 70 °C do not bother anyone, such as a plant room, garage or outbuilding

  • Hydro: a frost-protected location, clarified pipe routes and an installation partner to connect it to your heating system

Applications

  • Residential buildings with PV

    For detached houses and smaller residential buildings whose PV system regularly generates more electricity than the house needs, and whose surplus earns little.

  • Residential buildings with heat demand

    For sites with a pool, buffer tank or heating, where the Hydro version puts the waste heat straight to use.

  • Small businesses and agriculture

    For businesses with their own PV system that want to find out what their surplus is worth without a large project.

  • Systems with an export limit

    For PV systems whose export is limited by the grid operator and whose surplus would otherwise be lost.

Our partner network

The HASHLYNK team in a meeting at the office

Let's talk about your site's potential.

Send us a short message, or start the site assessment right away for an initial view of whether Air or Hydro suits your surplus.

Your site details
1. Your enquiry

Fields marked with * are required.

Personal details
Site address
Privacy
Newsletter
2. Site details · optional

Fields marked with * are required for the site assessment. Everything else is optional: share what you already know — we can discuss the rest together.

Installation & electricity generation

If known; otherwise we model the PV generation.

Feed-in & remuneration

Ideally state the average of the last 12 months or the expected remuneration.

Several files possible. For surplus feed-in, an annual amount or a usable annual profile is required. PDF (up to 2.5 MB) or CSV.

No file selected

Consumption

Not to be confused with grid import alone.

Several files possible. CSV files only.

No file selected

Electricity storage

Self-consumption takes priority. Free PV and storage energy for mining is simulated for your specific site.

Heat & heating
Additional details & files

Describe any relevant building, building services or automation details, such as smart home systems, heat distribution, buffer tanks, radiators, underfloor heating or concrete core activation.

Several files possible, for example photos, a system diagram or additional bills. Photos, PDF (up to 2.5 MB) or CSV. Photos are resized automatically.

No file selected

SingleUnit FAQ

Who is SingleUnit suitable for?

For residential buildings, small businesses and farms with a PV system and a regular surplus that earns little. It is the entry point for anyone who wants to start using surplus electricity through Bitcoin mining with little effort.

SingleUnit or HashUnit?

SingleUnit works with one or two miners and therefore often covers only part of the surplus. If your surplus is larger or you want a complete system in a compact housing, HashUnit with up to four miners is the next step.

Air or Hydro – which suits my site?

Air is the simpler version and fits when no heat is needed and the location tolerates noise of up to 60 dB and warm exhaust air. Hydro is worthwhile if you can use the waste heat for a pool, buffer tank or heating. We clarify which version fits in the site assessment.

What electrical requirements does the site need?

For one miner, a suitable, protected connection for around 4 kW continuous load is enough. From two miners, a separate sub-distribution board is mandatory, which we can plan and install. You also need a connection to your PV system and a LAN connection.

What does a SingleUnit cost?

You receive an individual quote after the site assessment. As a guide: in our current designs, Air with two miners came to around €5,700 net including sub-distribution board and project planning, Hydro with one miner to around €5,300 net plus the installer. A minimal solution with used miners starts from €1,000 net.

How are the earnings paid out?

The Bitcoin earned is paid continuously and fully automatically to a wallet address you provide. You alone have access to it at any time. Converted into euros, revenue is between €0.05 and €0.20 per kWh, depending on the market.

Should I keep the Bitcoin or sell it?

That is your decision. Holding builds up a long-term position but brings no ongoing euro income. Selling regularly gives predictable euro income but forgoes possible price gains. For context: anyone who converted surplus into Bitcoin between 2022 and 2025 and held it until the end of 2025 achieved an average of €0.33 per kWh, or €0.14 per kWh when selling immediately. This is a look back, not a forecast.

Who carries out the Hydro installation?

Project planning, control cabinet construction, electrical work and commissioning come from us. A certified installation partner carries out the hydraulic installation, the integration into the building and the pressure test. The partner is commissioned and invoiced separately.